Vetrotech Saint-Gobain Launches Improved PYROSWISS SBS

Vetrotech Saint-Gobain Launches Improved PYROSWISS SBS
Photo source
www.vetrotech.com

Date: 3 October 2017

The updated PYROSWISS Smoke Barrier System (SBS) offers more flexibility in size and is even easier to install in a shorter amount of time.

PYROSWISS SBS provides a transparent, frameless fire resistant barrier that guarantees comprehensive smoke protection for up to 120 minutes.

The product is designed to control the movement of fire and hot smoke within buildings in the event of fire, blocking or rechanneling the passage of smoke or heat from a smoke-filled area to adjacent parts of the building and providing a safe escape route.

Vetrotech has made a number of significant improvements to the product, which has various uses including smoke reservoir boundary, channeling screens, corridor containment, and escalator and elevator containment.

PYROSWISS SBS consists of toughened fire resistant safety glass with a choice of two fixings; Eco, a steel fixing or Design, a stainless steel fixing.

 

Larger sizes, fast and easy to install

As well as now providing PYROSWISS SBS in much larger dimensions (up to 2960 x 1500 mm), with both landscape and portrait size options, it includes two holes and fittings per panel for a faster and cost effective installation.

Improvements also incorporate the addition of a brand new unexpected glass breakage protection ‘SAFE’ film option which prevents the glass from scattering if shattered.

Faster and easier to install, the products can be implemented to complement architectural trends both internally and externally.

With its new, larger dimensions, landscape and portrait application options and its unexpected glass breakage protection, the improved product brings a number of new benefits for architects and specifiers alike.

600450 Vetrotech Saint-Gobain Launches Improved PYROSWISS SBS glassonweb.com

Others also read

New dynamic glass delivers true-to-life views & neutral aesthetics
Maltha Glass Recycling, a leading European recycler and Renewi subsidiary, announces a successful pilot test with Saint-Gobain.
On 12 February 2025, AGC and Saint-Gobain officially inaugurated the Volta production line in the presence of local authorities, stakeholders and representatives of both companies.
Clarity Glass, in collaboration with LiSEC, is revolutionizing Brazil’s tempered glass sector through cutting-edge automation.
Saint-Gobain Glass is pleased to announce the launch of Climalit® Plus in Morocco, an innovative double-glazing solution with solar control designed to enhance energy efficiency in modern homes.
The NGA Glass Conference in Carlsbad, CA, highlighted industry partnerships, with Lisa Winckler discussing the evolving role of safety film in schools.

Add new comment

From industry

Polígono Industrial El Bayo, parcela I, 19
24492 Cubillos del Sil León
Spain