Others also read
2018 is going to be a very important year for the building and construction industry.
In cooperation with the company Forel, a vertical line scanner was installed at the Kosovar company M-Technologie after the washing machine on a Forel insulating glass line.
Due to the internationalization of the glass sector, and in line with our growth policy, next October we will be present at Glasstec, one of the most important trade fairs in the sector.
The cooperation between LiSEC and Cristaleria Reina started in 2002, 2008 the production equipment was 80% LiSEC machines.
Dream Glass Group has recently launched its new website with a complete makeover, revamping its image and product offering.
Sawig Office is a modern and fully glazed office building located in Podgórze, a district of Krakow, Poland.
Slimpact® Frameless Impact Window increases overall size by over 90% while meeting HVHZ.
Tecglass will be in Shanghai, April 19-22, with the most innovative solutions for digital printing on glass developed by the Digital Branch of the Fenzi Group.
The complete renovation of Jardines de Nivaria 5* hotel in Tenerife seizes the exclusive design, safety and ease of installation of Comenza railing systems.
The Tvitec-Forel line can process some of the largest sizes of IG glass requested by today’s market.
As of today, the utmost precision in printing is easier than ever to achieve.
View and admire at glasstec 2018 in Düsseldorf from 23 to 26 October.
Tecglass crowns its consistent growth and major innovations for 2018 with a new website, packed with news about the many advantages this avant-garde technology holds for the glass industry.
The main reason why Uyut Stil opted for LiSEC machinery is the fact that LiSEC offers solutions for every production step in glass processing.
CE Glass Industries invested in a LineScanner from Softsolution to enhance efficiency to a great extent.
Tvitec fabricated more than 2.000 sqm of different architectural glass solutions.
The new Sistema Masa project is the Al Brooq Tower, in Doha (Qatar). It is a tower with ceramic facade cladding that will have 43 heights and 258 floors.
PRESS GLASS supplied near 200 m2 of complex point fixed structural glazing to the centre-piece two storey ground floor main entrance screens.
LiSEC delivers the first laminated glass line developed and built in-house.
A recently completed research project investigated the development of a standardised and non-destructive test method for determining anisotropies.
"Transparent glass" is the name of a project with the aim of assessing and optimising the quality of toughened and heat-strengthened (semi-tempered) glass achieved using photoelastic methods.
Hitherto it has only been possible to determine the product quality of thermally tempered glass by means of destructive testing.
A LiSEC automatic cutting line with loading system was recently installed at Glass 360, a newly formed glass processing company in Queensland.