HORN to rebuild Russian container glass furnace

Date: 24 September 2021
Source: www.hornglass.com
HORN to rebuild Russian container glass furnace
Photo source
www.hornglass.com

Date: 24 September 2021

HORN received the order for a rebuild of Steklotech’s Furnace 1 at the beginning of August 2021.

Steklotech LLC is the only one glass container manufacturer in the Ural federal District in Russia. The manufacturing capacity of the factory is 300 million glassware products per year. Steklotech manufactures many sorts of glass bottles and jars for alcohol, non-alcoholic drinks, jam etc. 

HORN received the order for a rebuild of Steklotech’s Furnace 1 at the beginning of August 2021. This project in Tyumen region (Russia) includes the repair of a 200 t/d end fired furnace with two production lines for container glass with a melting area of 100.8 m². The furnace is designed in appliance with the most advanced technology to produce amber and green glass. Heating of the furnace will be effected by means of Natural Gas burners.

HORN’s scope of supply includes the combustion system, electric measuring and control system and several engineering services. The furnace will be equipped with the new Forehearth GCS Series 301-Advanced. This forehearth system is characterised by the most advanced technology in forehearth design for high-pull forehearths and the highest temperature homogeneity requirements (K-factor).

600450 HORN to rebuild Russian container glass furnace glassonweb.com

Others also read

By targeting the most energy-intensive part of the glass production process, namely the melting of the glass, ZeroCO2Glas opens up the possibility of saving a particularly large amount of energy and greenhouse gases.
Glass Futures announces the appointment of Justin Kelly as new CEO effective 4th November 2024 whilst founding CEO Richard Katz is appointed President.
Şişecam, one of the top five global manufacturers in both glass packaging and flat glass sectors, will participate in the 29th Eurasia Packaging Fair which will take place from October 23-26 at the TÜYAP Fair and Congress Center.
SOTUVER and HORN complete successful cold repair of furnace No. 2 in Tunisia.
From 22 to 25 October 2024 glasstec, the world-leading trade fair of the glass industry, invites glaziers and craftspeople to Düsseldorf.
HORN has completed its biggest End Fired Furnace project in the company´s history with Turkish glass manufacturer Baştürk Cam.

Add new comment

From industry

NEWS RELATED PRODUCTS

A+W Software GmbH
Horn Glass Industries