350 tpd End Fired Furnace, Ardagh Glass, Gostyn, Poland

Date: 29 April 2015

Ardagh Group is a leading packaging company operating 100 facilities in metal, glass and technology across 25 countries.

The company employs 19,000 people and has a reputation for innovation, pioneering new production methods, new design techniques and new ways to recycle and save energy.  The combined output of their global operations is over 35 billion containers a year.Ardagh Glass is a company who manufactures glass packaging for some of the world’s biggest brands across every sector including beers, foods, wines, soft drinks, spirits and pharmaceuticals.







Ardagh Gostyn has operated three regenerative cross fired-furnaces in the past and has contracted HORN as a well-known supplier to carry out the complete project, beginning from the planning and engineering until forehearth refractory superstructure, have been supplied.







In Q I/2015, furnace No. 3 was rebuilt as a new regenerative end-fired furnace with four lines. Due to limitations in the building, the building was enlarged (height and length) before starting furnace works. The working end together with forehearths 3.1, 3.2, 3.3 and 3.4 has been designed completely new. The new furnace is specified for 350 tpd flint glass. The melting area is 123, 5 m².

600450 350 tpd End Fired Furnace, Ardagh Glass, Gostyn, Poland glassonweb.com

See more news about:

Others also read

By targeting the most energy-intensive part of the glass production process, namely the melting of the glass, ZeroCO2Glas opens up the possibility of saving a particularly large amount of energy and greenhouse gases.
Glass Futures announces the appointment of Justin Kelly as new CEO effective 4th November 2024 whilst founding CEO Richard Katz is appointed President.
Şişecam, one of the top five global manufacturers in both glass packaging and flat glass sectors, will participate in the 29th Eurasia Packaging Fair which will take place from October 23-26 at the TÜYAP Fair and Congress Center.
SOTUVER and HORN complete successful cold repair of furnace No. 2 in Tunisia.
From 22 to 25 October 2024 glasstec, the world-leading trade fair of the glass industry, invites glaziers and craftspeople to Düsseldorf.
HORN has completed its biggest End Fired Furnace project in the company´s history with Turkish glass manufacturer Baştürk Cam.

Add new comment

From industry

NEWS RELATED PRODUCTS