Others also read

All projects will be judged by this international jury of renowned industry professionals representing the architectural and design industries
Consolidated Glass Holdings, Inc., (CGH) will debut ACCESSGARD™ security glazing at booth #848 during the 2019 International Security Conference & Exposition (ISC East) at the Javits Center in New York City, Nov. 20–21.
Global Architectural Design Competition Opened November 12
cube berlin is an eye-catching, 11-storey office building located at Washington Platz in the Europacity urban district of Berlin.
Interview John Kooymans, Principal at Read Jones Christoffersen Ltd.
The testimony of Lepage confirms once again that the Mappi tempering furnaces are the best solution both for what it wants to grow and for those who want to continue to remain great.
Latest innovative product offering provides a major market place need.
Stunning ‘organic’ façade delivers eye-catching aesthetics and coas tline environmental resistance thanks to SentryGlas® interlayers.
Trosifol experts talk about glazing possibilities and safer railings.
Merkacristal bought its third Mappi furnace, an ultra-modern ATS 4.0 2500x4200.
We are pleased about the conclusive reference of our customer Andreas Appel – technical director at Thiele Glas.
Luoyang NorthGlass SiNe New Material Co., Ltd. a joint-stock subsidiary of NorthGlass, will launch the "SiNest" unit curtain wall for the first time on FBC 2019.
Eastman is excited to announce the launch of its new enhanced acoustic interlayer - Saflex® E series acoustic polyvinyl butyral (PVB) interlayer.
Since 1993, Mappi International has been designing and manufacturing high quality tempering systems for the glass industry.
Throughout the year, Glaston has received several orders from North American customers.
Bringing Leading Technical Support and Technology to American Market.
Well-known manufacturers from Mexico, Italy, Greece and other countries sent us an “olive branch” and signed the intention contract for the purchase of Glass Tempering Furnace on site.
More than 25,000 square meters equipped with state-of-the-art technology, never seen before on such a specialized sector.
The enormous glass facades of the skyscrapers represent the most difficult challenge for those who work glass.
Specialist Glass Products has more than doubled its production capacity in recent weeks with the installation of a new state-of-the-art glass furnace.
NorthGlass provided high-quality glass for the project, which was the first Huawei store that NorthGlass participated in the construction.
GRECO is pleased to announce that they have been awarded the railing package for one of Dallas’ most anticipated arrivals, The Victor.
With fire safety being critical in modern construction projects, WeWorks developed and implemented a new fire safety strategy before renovating the existing building.