Others also read

The new end fired furnace, which produces container glass in the colours amber and green, was finally successfully commissioned at the end of the first quarter of 2022.
State-of-the-art technologies, innovative spirit and technological leadership - all these attributes stand for both HORN Glass Industries AG and Wiegand-Glas.
For our customer Bastürk Cam we will soon build a 560 t/d end fired furnace with a melting surface of 185.4 m² in their plant in Malatya, Turkey.
Bottero and Tiama are pleased to announce the creation of an independent company called GlassFORM.ai based in Rovereto, Trento, Italy, with the goal to develop solutions for process automation.
Adding to the dialogue on the transition towards a climate-neutral society, the European Economic and Social Committee (EESC) has called for more action to be taken to protect the European glass industry.
HORN received the order for a rebuild of Steklotech’s Furnace 1 at the beginning of August 2021.
The Fenzi range of paints developed for the hollow glass industry is expanding with a new line of organic, water-based paints designed for glass packaging.
British Glass, the representative body for the UK glass sector, in consultation with its members has today (19 July) published a strategy that sets out the glass industries potential route to net zero carbon emissions.
Installation is planned to start in the second quarter of 2022.
Şişecam will establish its first glass packaging plant in Europe with 2 furnaces in Hungary.
HORN® has started the furnace heat-up process at glass packaging supplier Frigoglass' 300 t/d end fired furnace GF2 in Nigeria.
AGI glaspac has partnered with HORN Glass Industries AG of Germany to build a new furnace of 154 TPD at AGI Speciality Glass Division’s Bhongir plant in Telangana.
The existing furnace will be enlarged by HORN® and equipped with new heating equipment and safety control.
The furnace is designed in appliance with the most advanced technology and a maximum melting output of 290 t/d to produce either 290 t/d flint or amber glass or 280 t/d green glass.
What needs to be considered when using infrared thermometers, IR cameras and our new glass inspection system in different glass applications?
This year in April HORN received the order for the repair of furnace 1 for the plant in Steinbach am Wald, which is an 82.8 m² end fired furnace.
Şişecam Group reports investments of TRY 625 million in the first six months of 2020
When enhanced with Fenzi products, glass plays an increasingly crucial role in the world of packaging.
Since the beginning of February, employees of HORN Glass Industries AG have been on a construction site in Orizaba, a city east of Mexico City, in order to set up and commission a glass melting plant for its customer SIVESA.
Currently the world is under pressure to limit global warming. We need to change our way of living and our way of producing things.
On 02 September 2019, 11 apprentices started their careers at HORN.
Şişecam Group’s glass packaging production capacity in Turkey reaches 1.3 million tons.
Outstanding resistance and durability are only two of the features of the innovative range of thermoplastic paints recently rolled out by the Fenzi Group.
Horn opted for Siemens process control, communications and power supply technology for the container and float glass line.
Şişecam Glass Packaging, a company of Şişecam Group, received an award from WorldStar Packaging Awards competition in the “beverages category” with the beer bottle designed and produced specifically for Tuborg.