Others also read
After a four-day audit, industry-leading systems supplier VEKA Group was awarded the International Standard ISO 50001 Energy Management Systems.
Intersolar Europe has started 2019 with a bang: 95 percent of the 63,000 square meter exhibition space has already been booked – and there are still four months to go!
All jobs are saved. Insolvency administrator Dr. Holger Leichtle of Schultze & Braun: “We have reached an agreement with which, in my opinion, all parties involved can be highly satisfied”.
Yale Door and Window Solutions has achieved a product-specific Environmental Product Declaration (EPD) certification for its Revolution Window Hinge.
Over 35,000 architecture fans get to look inside a host of exciting buildings in Munich.
The BAU 2019 is already finished. It was really amazing and busy time, full of interesting meetings and inspiring conversations. Press Glass would like to thank all who visited them at their stand.
On January 16, 2019 profine GmbH welcomed the Minister President of the German state of Rhineland-Palatinate, Mrs. Malu Dreyer, to its Pirmasens site.
GLASTECH Produktions- und Verfahrenstechnik GmbH is successfully certified according to ISO9001:2015
In a two-stage certification audit of TÜV Austria, Glastech Produktions- und Verfahrentechnik GmbH was certified according to ISO 9001:2015.
Deceuninck is one of the first PVC-U systems companies in the UK to gain the VinylPlus® Product Label for sustainability following a successful audit by BRE (Building Research Establishment).
At the BAU 2019 trade fair, the team from the Roto Aluvision division provided manufacturers of aluminium doors with information about installation of the “Roto Solid C” concealed door hinge, among other topics.
The VDMA working group "Standardized Interfaces in the Glass Industry" is working on manufacturer-independent standards with the participation of machine builders, software manufacturers and users.
Demands for a new main entrance door are constantly increasing. This is because a main entrance door creates a visitor’s first impression of a home, and it should ideally be a welcoming one.
Manufacturing glass 365 days a year, up to 810 tonnes daily, in ten years a 3.5-meter wide glass sheet approx. 75,000 kilometers long – enough to go around the Earth twice.
At BAU 2019, the profine Group, system provider of the KBE, KÖMMERLING and TROCAL brands, is represented in Hall B4, Stand 528.
A Q&A with Forno Vice President, Brian Albanese
Hydro will be more present than ever at BAU 2019, the top trade fair in Munich on January 14-19, where key players in the global building and construction market meets to discuss advanced building solutions.
Energy-saving, bird-friendly glass optimizes daylight, adds depth to Centre for Entrepreneurship.
PRESS GLASS SA is pleased to invite everyone to the official international premiere of the 3D GLASS product.
ALUMIL will participate at the world's leading trade fair for Architecture, Materials and Systems “BAU 2019”, which will take place from January 14th to 19th at Munich’s Exhibition Center “Messe München”, in Germany.
Glass staircases and frameless balustrades are becoming an increasingly popular option in staircase trends.
ETEM’s visitors will have the opportunity to get acquainted with the latest product developments on an area of 72 sq.m.located in Hall C1 Stand 411.