Others also read

Restoration of the magnificent 38-story Book Tower Building in Detroit, Michigan is underway, and Quaker Windows & Doors is excited to be a part of it.
The nearly 100-year-old building at 6001 Cass Avenue, Detroit, Michigan will soon assume a new identity and Graham is proud to provide more than 870 windows to this beautiful adaptive rehabilitation project.
Hazlemere Commercial first engaged with Lancaster Gate Housing Association (LGHA), located on Gloucester Terrace in West London almost 6 years ago.
Steel Window Association (SWA) member, West Leigh, retrofitted three different systems into the building.
On June 28, at GPD 2019, Cedric Janssens, Public Affairs Manager at Glass for Europe, presented the paper "The contribution of energy efficient glazing to Paris objective in different EU building renovation scenarios".
The Window and Door Manufacturers Association (WDMA) is applauding reintroduction of the Energy Savings and Building Efficiency Act (H.R. 3586), sponsored by Rep. Kurt Schrader (D-OR).
On 5 June, Glass for Europe was in Riga, to meet national delegates from all EU members (and Norway) who gathered to discuss the EPBD implementation during the CA EPBD – Plenary Meeting.
Suntuitive® Dynamic Glass is pleased to announce the addition of Manko Window Systems Inc., to their Certified Fabricator program and as an exclusive distributor in specific territories.
On May 21, European glass and glazing national associations came to Brussels to participate in the traditional annual workshop organised by Glass for Europe for national glass associations and EU flat glass manufacturers.
Monticello is Thomas Jefferson’s estate, preserved now as a UNESCO World Heritage Site, it serves as a museum, place of study and research, and a historical site.
Leading local fabricator chooses Caldwell folding openers available from Window Ware to help them deliver safe and simple window operation in a local school science laboratory.
The new 2019 California Energy Standards, slated to take effect January 1, 2020, continues the state’s pursuit of its goal to achieve zero net energy (ZNE) by 2020 for residences and by 2030 for commercial buildings.
A £2.4m project to transform Bolton’s Westregen House, home to German-based Krones Group, features aluminium glazing from award-winning AluFoldDirect.
When The Window Company (Contracts) completed phase one of the window and door replacement project at Hatcham College, the school’s Business Manager Mary Williams, was impressed with the company’s whole approach.
The year of 2018 is an important year to inherit the past and open the future for China's  "13th Five-Year Plan".
A fresh brochure by Glass for Europe to support the development of window- and glazing-proof building codes.
In November of 2017 the Korea Land Development Museum opened its doors and we were proud to be a part of this project.
54 Spectus white vertical sliding windows with through horn detailing, including 14 arched vertical sliders, have been installed in a prestigious refurbishment project at Foxhill House, Chester.
Spectus Vertical Sliders have been used in the refurbishment of University of Sussex student accommodation in Brighton.
Hazlemere Commercial was appointed as the Main Contractor to carry out replacement window works on the nine-story YMCA building in Hayes, West London. Although the building remained occupied throughout the work, inconvenience to the tenants was…
Suntuitive® Dynamic Glass is pleased to announce that it is partnering with leading Australian consultancy firm Certified Energy to represent the Suntuitive product line in Australia.
As commercial office developments continue to move towards larger, open-plan spaces that can require more power to heat, an over-reliance on the thermostat can drastically increase CO2 emissions and utility bills.
Crittall was contracted to replace the windows in the tower and Berkeley profiles were specified including both windows and doors.
Steel Window Association member, West Leigh, designed, manufactured and installed the £1million package on behalf the main contractor.
Newview was appointed to replace all the windows on three 20 storey tower blocks for London City Airport.