Others also read
High-quality glazing requires high-quality systems for the quality control of glass.
The fire-resistant glazing in the frameless system POLFLAM® BR, classified as EI 60. POLFLAM® glass, was also used for the fire-resistant doors in the staircases and is a definitive architectural feature of the building.
POLFLAM® fire-resistant glass has been used in the skylight over the hotel lobby.
Fire-resistant glazing with a satin finish is an effective visual barrier at the same time ensuring access of soft, diffused light. It is also neutral in terms of style and therefore blends perfectly with a multitude of different architectonic…
Polflam is not losing speed. Our R&D Department continues to work very intensively, developing new solutions and performing dozens of tests and studies.
Building with glass requires a few safety considerations.
In June, specialists from POLFLAM took part in the conference “Modern Glass Partitions – Key to Building Comfort”, which had been organised by the editors of “Świat Szkła” (Glass World) monthly magazine.
With the pandemic-related restrictions being lifted, we are gradually relaunching our training activities – in Poland and abroad. More and more dates are being fixed for events that had to be postponed.
Saint-Gobain Glass is delivering online training to architects, façade fabricators and specifiers during the government lockdown with a range of free glass and façade focused webinars.
Recently, NorthGlass has been assessed by Saint-Gobain Deutsche Glas GmbH as A-supplier for the project “New Temper Furnace” in Freiburg, Germany.
Important notice: The organizer has finally postponed the fair until next year for public health security reasons. We will notify you about the exact date once it is announced.
A perfectly designed LiSEC glass cutting line has become outdated. It is in good mechanical condition, but it is suffering from the phenomenon called “ageing”.
Cube Glass has again increased its presence in the important UK stadium market with a major contract at Rangers Football Club’s state-of-the-art Hummel Training Centre.
Contemporary architecture definitely means glass; its minimalism being combined today with the warmth and nobility of natural materials.
With fire safety being critical in modern construction projects, WeWorks developed and implemented a new fire safety strategy before renovating the existing building.
Pyroguard has successfully achieved EI(1)30 criteria for the use of its glazing in Jansen door systems, broadening application scope across Europe.
Expanded Promat SYSTEMGLAS® range offers assured fire protection for additional glazing applications
The SYSTEMGLAS® fire resistant, butt-jointed glazing system range from Promat UK has been expanded with a host of new configurations and additional performance capabilities.
86 metres long, 40 metres wide and 18 metres high - these are the dimensions of the newly created business park with hotel complex and integrated vehicle museum in Langenthal.
Lindner Interiors Ltd has achieved the esteemed FIRAS certification for the design, supply and install of fire rated glazing and steel doors.
A project to create a high quality meeting room and classroom within the new Upper School of the prestigious École Jeannine Manuel School in London has been completed using the complete fire resistant, timber frame glazing system Promat SYSTEMGLAS® …
Pyroguard has significantly increased its capabilities in India with the expansion of its team.
Scientist Catherine Norris joined the Pyroguard team back in July 2018.
New test evidence released by the Government, overwhelmingly demonstrates the effective performance of timber fire doors in the UK.
Oliver Kunz has been appointed as Sales Director for Germany.
Coal Drops Yard has been transformed into one of London’s premier shopping destinations.