Others also read

Work has recently finished on the new Leonardo Royal Hotel Edinburgh with fabricator Total Glass manufacturing 350 unique WarmCore windows to give the hotel a regal finish.
The energetic efficiency at the highest level. From 1 November the Aluplast HST 85 system are equipped with warm Thermostep 204 thresholds in its standard versions.
"Verification of authenticity" for products tested at ift Rosenheim
Higher quality and more international participants​​​​​​​
Numerous planners and installers rely on sprayable sealants: simple processing and cost-effective utilisation make sealants attractive. The product range is wide and covers all eventualities in terms of sealing and grouting.
Capoferri chooses the Archmarathon Award to display Plathéa, the new series of windows and doors featuring extremely slim profiles.
As part of the redevelopment of the original 1960s Deeside Fire Station, curtain walling, doors and windows from Sapa, have been specified and installed to meet the modern day performance requirements of this 21st century fire and rescue service.
The Physical Test Steering Committee of the Architectural Glass and Metal Technician (AGMT) Certification Program, began development of conceptual test apparatuses at a meeting held on September 20, in Hanover, MD.
Pilkington United Kingdom Limited, part of the NSG Group, has two new patterns joining its popular Pilkington Texture Glass range.
Switching to digital lead management and quotation tools is not only cutting the time installers spend on paperwork but helping them to win business.
Clients and Architects have come to expect glass to be perfect and present no visual barrier to the view outside the building except for a reduction in light transmittal.
The Window & Door Dealers Alliance is pleased to announce the appointment of Katie Gregg as Associate Director, WDDA Industry and Member Engagement.
New system combines form and function to create an architect’s dream.
The modern interpretation of the conservatory.
The VEKA Group has acquired a major stake of NCL Wintech, a subsidiary of India based NCL Group.
The two-part cill means that window cills are now installed in a simple two step process. Firstly, the cill receiver is fitted during the construction process and secondly the cill nose is clipped on upon project completion.
Whenever our surrounding cities expand, change, and modernize, it seems like Giroux Glass is always right there in the middle of it all.
To support the passive design strategies used by the architect to deliver low-energy climate control, Pilkington supplied 600 m2 of Pilkington Insulight™ Sun double-glazed units.
New SunGuard SNX 50 will be available as both an annealed and heat treatable version.
The work involves the surveying, then manufacture and installation of white powder coated Sapa Dualframe 75 SI Window Wall, vertically sliding Sapa Dualslide replacement double glazed windows and a thermally broken Sapa Stormframe STII commercial…
Graham played a key role in the realization of 1601 Vine Street, a 32-story, Philadelphia high-rise, by developing a solution where others could not.
A call for applications to an £18 million Circular Economy Investment Fund brought together people from across the building, demolition, waste processing and glass industries this week.
The American Architectural Manufacturers Association (AAMA) will be traveling to Orlando, FL, this February for the AAMA 81st Annual Conference, to be held February 19-22, 2018, at the Loews Portofino Bay at Universal Studios.
Energy-efficiency and sustainablity, coupled with safety, design and comfort are some of the key requirements in the world of windows, doors and facades.
Pilkington Planar™ structural glazing was specified by St John’s church in Egham to add a new community centre to its landmark Georgian building, originally built in 1817.