Horn officially launched the “heating up” of the container glass furnace at the newly built production plant in Turkmenistan

Horn officially launched the “heating up” of the container glass furnace at the newly built production plant in Turkmenistan
Photo source
www.hornglass.com

Date: 24 October 2017

The new line in Turkmenistan has been fabricated on a surface of 240,000 m² and is comprised of a 250 t/d float glass line as well as a 50 t/d container glass production plant.

At the beginning of 2016 HORN Glass Industries AG signed a contract with Messrs. Tepe for providing a complete, turnkey production plant.

Horn officially launched the “heating up” of the container glass furnace at the newly built production plant in Turkmenistan

The new line in Turkmenistan has been fabricated on a surface of 240,000 m² and is comprised of a 250 t/d float glass line as well as a 50 t/d container glass production plant.

On Friday the 20th of October 2017 Horn officially started to heat up their burners in Turkmenistan. The aim of the process is to heat up the cold furnace until the desired temperature is reached.

This project was a definitely a challenge and proved once again the company’s capability and expertise.

Horn officially launched the “heating up” of the container glass furnace at the newly built production plant in Turkmenistan

Horn officially launched the “heating up” of the container glass furnace at the newly built production plant in Turkmenistan

600450 Horn officially launched the “heating up” of the container glass furnace at the newly built production plant in Turkmenistan glassonweb.com

Others also read

Glasstec proved invaluable for TC Float, providing the perfect setting to sign its 100th contract
By targeting the most energy-intensive part of the glass production process, namely the melting of the glass, ZeroCO2Glas opens up the possibility of saving a particularly large amount of energy and greenhouse gases.
Glass Futures announces the appointment of Justin Kelly as new CEO effective 4th November 2024 whilst founding CEO Richard Katz is appointed President.
Şişecam, one of the top five global manufacturers in both glass packaging and flat glass sectors, will participate in the 29th Eurasia Packaging Fair which will take place from October 23-26 at the TÜYAP Fair and Congress Center.
SOTUVER and HORN complete successful cold repair of furnace No. 2 in Tunisia.
Float glass manufacturer Guardian Glass has installed an energy-efficient furnace supplied by industrial engineering group Fives at its facility in Bascharage, Luxembourg.

Add new comment

From industry

NEWS RELATED PRODUCTS

A+W Software GmbH
A+W Software GmbH