MOST VIEWED NEWS IN PAST 7 DAYS
8735 results
| Vetreria Bertoldo decided to invest in Forel’s top performing solution for the production of insulated glass, the “High Tech” IG line.
| Millet Group a major French manufacturer of tailor-made windows since 1946, has launched a project to design the most siMple possible window, with the target to make it INVISIBLE, SLIM and SOLID.
| Brazilian glass fabricator SER Glass, Research Frontiers and Israeli material science company Gauzy Ltd. bring high volume armored smart glass and other smart window products to Brazil.
| We´re pleased to announce that Sandra Kugler just started to work for Viprotron as our new Sales Manager Europe.
| The 17th International Glass Products, Glass Manufacturing, Processing & Materials Exhibition take place at Halls 5 & 6 Indonesia Convention Exhibition (ICE), Jakarta from 12 - 14 November 2019.
| The new line, with an annual capacity of 6 million square meters, will operate alongside the existing coated glass line.
| We are pleased to announce that the FOG Group has acquired eBusiness provider Xavannah GmbH & Co KG as part of Toronto-based Vela Software and Constellation Software, which also includes A+W Software GmbH.
| Thanks to the triple insulating glass with the thermal insulation coating SILVERSTAR ZERO Eplus, a comfortable room climate is created in the bright, daylight-flooded rooms.
| Read about how Bill 919 protects wild birds on the Walker blog.
| Insight into the biggest show of the year that kicks off today
| Italy shines at GlassBuild America 2024 in Dallas with a dedicated Pavilion highlighting top glass machinery and innovative solutions.
| Eastman Machine announces the appointment of RegaLead to represent its line of cutting solutions to the laminated glass sector in the UK and Ireland.
| Glaston shares insights from China Glass 2026, featuring a CEO-level discussion on collaboration, innovation, and the future of automotive glass.
| Providing project flexibility and design durability advantages for architects and glass laminators
| The entire upgrade took only 25 days. The completed furnace was shorter in length, reducing the line’s footprint. Plus, the machine consumed much less energy, an added benefit.
| Şişecam has completed its greenfield flat glass facility investment in Tarsus, realized with a 315 million Euro investment, commissioning the TR9 line.
| Not far from Munich airport, Boardinghaus Eching was recently upgraded to include a spectacular cube featuring Glas Trösch glazing.
| A production solution for highly-customized manufacturing
| Like the other solutions of Forel range, the Art. LL lamination line mirrors the company philosophy of providing a solution that guarantees excellent automation, innovation and quality.