Date: 27 August 2009
Nowadays, Landglass’ new workshop in 20,000 m2 has sprung, and other auxiliary and outskirt supporting facilities are under the tight and ordered construction.When Vice Mayor Yang walked into the 240m long and 84m wide workshop, General Supervisor Jiang Ligong introduced: The design, material selection and construction of the new plant all are conducted based upon the principle of precision, and our purpose is to build Landglass’ new plant to be a top modern equipment manufacturing center, and enable our currently most advanced equipment to be manufactured and commissioned in the currently most modern plant!
At that time, Landglass’ new plant will not only be the assurance of great increase of Landglass’ productive capacity, but also a strong pivot point to enable Landglass to manufacture the international top products, establish Landglass’ image and expand its market share at home and abroad. At that time, Landglass’ old plant will act as the new products research, development and test base, where the ideas of Research and Development Department will be verified and improved, and where Landglass’ new products will come into being and boost the development of Landglass!
Vice Mayor Yang expressed her satisfaction with the construction situation of Landglass’ new plant, and she highly praised Landglass’ development planning. She said that, the research and development of new products and techniques are the strength of Landglass, and the competitive power of Landglass; and it becomes the booster of Landglass’ constant leaps when the crisis came. She expected that Landglass’ new plant project could be put into production as soon as possible, so that Landglass could manufacture the top equipment for the domestic and foreign users, bear more social responsibilities and add to the glory of “Made in China”.
Add new comment