Date: 26 May 2011
SORG EME BATCH PREHEATINGOne year ago the SORG batch preheater was extensively tested and demonstrated to glass specialists with 0 % cullet and a load of 60 t/day.
The first fully operational unit will be installed this summer on a 240 ton container furnace. The entire furnace throughput will be fed through the batch preheater.
One year ago the SORG batch preheater was extensively tested and demonstrated to glass specialists with 0 % cullet and a load of 60 t/day. The first fully operational unit will be installed this summer on a 240 ton container furnace. The entire furnace throughput will be fed through the batch preheater.
The BATCH3 concept was presented yesterday at the Glassman in Barcelona.
600450
Nikolaus Sorg GmbH & Co. KG
2011-05-26T13:00:00
SORG The First to Set Batch in Motion
glassonweb.com
Add new comment