Others also read

Strips of Spanish limestone and curtainwall alternate to create a visually interesting façade for Portland’s new 17-story Multnomah Courthouse.
Product innovations, networking, hands-on activities and competitions
Watch Vitro's interview with Javier Roberto López González, head of marketing at Prisma Hotel Group, to learn more about this artfully curated hotel, where glass itself has become a main character.
POLFLAM has successfully completed a series of fire tests on timber partitions for classifications EW 30, EW 60, EI 30, EI 60, EI 90 and EI 120.
This year's Otto Schott Research Award went to two European researchers: Professor Alicia Durán from the Spanish Research Council (CSIC) in Madrid, Spain, and Professor Daniel Neuville from the Institut de Physique du Globe de Paris at the…
Introducing DOWSIL™ 375 Construction & Glass, a high-performing polyurethane for use in glass balustrade embedding applications.
The 2022 Special Review Conference of science popularization was presided over by Li Cundong, secretary general of Architectural Society of China.
As the conceptual sponsor and cooperation partner of Messe Düsseldorf, the VDMA Glass Technology Forum is responsible for key programme content at the glasstec conference and activities at its own stand in Hall 15B26.
Thanks to the new CMS maxima machining center and the advanced system developed by CMS, BCE Glass Industry is the ideal partner to its demanding clients.
Glass in the interior can serve as acoustic or safety-relevant boundaries without visibly restricting the spatial volume.
There is a lot of excitement at RCN for the first shipment of an important laminating project, including a special layout for a glazier company located in Dubai that needs to laminate large glass sizes.
POLFLAM has successfully completed a series of fire tests on timber partitions for classifications EW 30, EW 60, EI 30, EI 60, EI 90 and EI 120.
The newly constructed Pikes Peak Summit House visitor center in Cascade, Colo., was designed to provide a seamless, immersive visitor experience.
The project adopts 7 layers of 15mm low iron SGP laminated glass, with a maximum size of 12m and the each glass weight about 5.6 tons.
An adequate and reliable design of the building structure is today more than necessary.
To optimally leverage the production resources of a tempering furnace, the bedload must strictly comply with production and quality requirements.
The new end fired furnace, which produces container glass in the colours amber and green, was finally successfully commissioned at the end of the first quarter of 2022.
Part of the concept is the Abercrombie Building with its dynamic façade of concrete panels and glass, partly complemented by OKAWOOD insulating glass with Functional Timber Grid.
FENSTERBAU FRONTALE and HOLZ-HANDWERK exhibition is back at Exhibition Centre Nuremberg as a one-off “summer edition” from 12-15 July 2022.
International Architecture Congress on 22 September 2022
Mountains and rivers decorate the Country, the Silk Road promotes the sports spirit
Dow is now offering the opportunity to realize an aesthetically pleasing “one-color-edge” for insulating glass.
100% quality is one of the prerequisites for long-term success.
Meet the evguard® team at booth E21 in hall 11 to learn more about our premium EVA interlayer for laminated safety, security and architectural glass