Others also read
With the pandemic-related restrictions being lifted, we are gradually relaunching our training activities – in Poland and abroad. More and more dates are being fixed for events that had to be postponed.
Vanceva® Colors - Upcoming live webinar—How to use Vanceva Colors in your next glazing design - Date: Tuesday June 23, 2020 │ 8:30 a.m. EDT / 02:30 p.m. CEST
Since the beginning of February, employees of HORN Glass Industries AG have been on a construction site in Orizaba, a city east of Mexico City, in order to set up and commission a glass melting plant for its customer SIVESA.
Important notice: The organizer has finally postponed the fair until next year for public health security reasons. We will notify you about the exact date once it is announced.
All projects will be judged by this international jury of renowned industry professionals representing the architectural and design industries
Global Architectural Design Competition Opened November 12
Solarban® 60 solar control low-emissivity (low-e) glass by Vitro Architectural Glass is featured in 9th and Thomas, a 12-story, 230,000-square-foot office-retail complex in downtown Seattle.
Cube Glass has again increased its presence in the important UK stadium market with a major contract at Rangers Football Club’s state-of-the-art Hummel Training Centre.
Contemporary architecture definitely means glass; its minimalism being combined today with the warmth and nobility of natural materials.
With fire safety being critical in modern construction projects, WeWorks developed and implemented a new fire safety strategy before renovating the existing building.
Binary code never looked so extraordinary.
Pyroguard has successfully achieved EI(1)30 criteria for the use of its glazing in Jansen door systems, broadening application scope across Europe.
Expanded Promat SYSTEMGLAS® range offers assured fire protection for additional glazing applications
The SYSTEMGLAS® fire resistant, butt-jointed glazing system range from Promat UK has been expanded with a host of new configurations and additional performance capabilities.
86 metres long, 40 metres wide and 18 metres high - these are the dimensions of the newly created business park with hotel complex and integrated vehicle museum in Langenthal.
On 02 September 2019, 11 apprentices started their careers at HORN.
Lindner Interiors Ltd has achieved the esteemed FIRAS certification for the design, supply and install of fire rated glazing and steel doors.
A project to create a high quality meeting room and classroom within the new Upper School of the prestigious École Jeannine Manuel School in London has been completed using the complete fire resistant, timber frame glazing system Promat SYSTEMGLAS® …
Pyroguard has significantly increased its capabilities in India with the expansion of its team.
Scientist Catherine Norris joined the Pyroguard team back in July 2018.
Şişecam Group’s glass packaging production capacity in Turkey reaches 1.3 million tons.
New test evidence released by the Government, overwhelmingly demonstrates the effective performance of timber fire doors in the UK.
Oliver Kunz has been appointed as Sales Director for Germany.
Coal Drops Yard has been transformed into one of London’s premier shopping destinations.
American Insulated Glass, LLC announced today that it will expand service of custom fabricated glass and distribution products to the Knoxville, Tennessee market.
Outstanding resistance and durability are only two of the features of the innovative range of thermoplastic paints recently rolled out by the Fenzi Group.