Others also read
The new end fired furnace, which produces container glass in the colours amber and green, was finally successfully commissioned at the end of the first quarter of 2022.
There are less than 30 days remaining to participate in The Italian Glass Weeks, the first edition of the event that combines two internationally renowned shows, Vision Milan Glass Week and The Venice Glass Week.
For our customer Bastürk Cam we will soon build a 560 t/d end fired furnace with a melting surface of 185.4 m² in their plant in Malatya, Turkey.
Bottero and Tiama are pleased to announce the creation of an independent company called GlassFORM.ai based in Rovereto, Trento, Italy, with the goal to develop solutions for process automation.
Meeli Kõiva (aka Mery Crystal Ra) celebrated her 30-year career as a pioneering international artist of glass and light with a conference, “In the Light of Energy Fields: Meeli Kõiva Meets Mery Crystal Ra,” at the KUMU Auditorium in Tallinn on…
The Builders Hardware Manufacturers Association (BHMA®) announced the publication of a new ANSI/BHMA standard, A156.44: Standard for Hardware for Architectural Glass Openings.
Adding to the dialogue on the transition towards a climate-neutral society, the European Economic and Social Committee (EESC) has called for more action to be taken to protect the European glass industry.
HORN received the order for a rebuild of Steklotech’s Furnace 1 at the beginning of August 2021.
The Fenzi range of paints developed for the hollow glass industry is expanding with a new line of organic, water-based paints designed for glass packaging.
Feel the privilege of double-sided glass in decoration
British Glass, the representative body for the UK glass sector, in consultation with its members has today (19 July) published a strategy that sets out the glass industries potential route to net zero carbon emissions.
Installation is planned to start in the second quarter of 2022.
Şişecam will establish its first glass packaging plant in Europe with 2 furnaces in Hungary.
HORN® has started the furnace heat-up process at glass packaging supplier Frigoglass' 300 t/d end fired furnace GF2 in Nigeria.
AGI glaspac has partnered with HORN Glass Industries AG of Germany to build a new furnace of 154 TPD at AGI Speciality Glass Division’s Bhongir plant in Telangana.
Yorglass Satin Range combines aesthetics with high quality
22 Bishopsgate, London: a new landmark emerges with artwork by Alexander Beleschenko
To create a highly visible, energy-efficient enclosure, Page and ZGF Architects specified Solarban® 90 clear glass for its ability to blend transparency and solar performance.
The existing furnace will be enlarged by HORN® and equipped with new heating equipment and safety control.
The furnace is designed in appliance with the most advanced technology and a maximum melting output of 290 t/d to produce either 290 t/d flint or amber glass or 280 t/d green glass.
This year in April HORN received the order for the repair of furnace 1 for the plant in Steinbach am Wald, which is an 82.8 m² end fired furnace.
Glass partition walls flood rooms with light and provide unequalled transparency. They convey a modern atmosphere and set strong accents in interior design, especially in black colour.
Since the beginning of February, employees of HORN Glass Industries AG have been on a construction site in Orizaba, a city east of Mexico City, in order to set up and commission a glass melting plant for its customer SIVESA.
SOUND ON to hear a quick clip of James Smith talking about a recent intense project challenge that he and the team at CGH are working on.