Others also read
Thermoseal Group Achieves the 6th Generation Investors In People Standard having achieved 27 criteria for leading, supporting and managing people.
The Glazing Summit Awards is the latest addition to this year’s eagerly anticipated Glazing Summit.
FIT Show event director, Nickie West responds to Fensterbau postponement...
Starglaze was looking for a reliable, state-of-the-art glass quality inspection system. The solution: LineScanner, SOFTSOLUTION's all-in-one system that inspects glass lites with extreme precision for all quality and surface defects.
For the first time in Scandinavia, an office building inaugurated in February 2019 has been equipped with eyrise® Dynamic Liquid Crystal Windows.
Since the last month of January 2020, Promac has become the new distributor of the complete range of monolithic and laminated glass cutting tables and smart warehouses of TUROMAS for the glassmaker sector in the UK and surroundings.
The Invisible Shield® PRO 15 Glass Coating is being applied to durably protect it long-term to keep it preserved and protected against the elements.
Steve Goble, Managing Director, HEGLA UK discusses the potential of the next generation edge deletion options from the leading system supplier.
Following four years of work on improving the recycling of flat glass waste across Europe, the FISSAC* project has held its final conference.
The Glass Futures study, which is due to be completed in March 2021, will investigate and recommend the most cost effective and environmentally efficient routes to decarbonise.
FIT Show organisers have been overwhelmed by the huge support that it has received from every corner of the industry since announcing that it would revert to a biennial frequency from May 2021.
Located on the Elbe River, on the western tip of the HafenCity in Hamburg, Germany, the Elbphilharmonie is one of the largest and most acoustically advanced concert halls in the world and an outstanding example of modern architecture.
FIT Show, the UK’s only dedicated event for the glass and glazing industry, will form part of the GGF UK Pavilion (Hall 4A, Stan 305) at Fensterbau Frontale (18 - 21 March, 2020).
The demand for more energy efficient insulated glass (IG) components has been growing worldwide with the global drive for more energy efficient buildings.
Visitors to this year’s Glazing Summit will again be able to have their say on the issues that matter.
A total of 404 glass fins from sedak enable large-area glass façades in the new Lakhta quarter
Sentry Glas® ionoplast interlayer from Trosifol helps SkyDome create unique on-board venue in state-of-the-art cruise ship.
Thermoseal Group, the UK’s leading manufacturer and supplier of the largest volume of spacer bars for insulated glass (IG) sealed unit production, gives an insight into the spacer bar market and predicted future trends.
One Manhattan West is the latest Tvitec’s milestone in New York. With 994 feet (303 meters), it was the tallest building that the company glazed in the USA in 2019.
Chicago-based architecture firm Skidmore, Owings & Merrill LLP (SOM) has recently completed a 530-meter glass skyscraper in Tianjin, making it the tallest building in northern China and the seventh tallest in the world.
The HEGLA group has seen many developments launched throughout 2019 with a drive to improve customer efficiency being the main focus.
FIT Show organisers and Building Our Skills (BOS) have joined together to launch a new campaign designed to get the entire fenestration industry discussing and challenging workplace stereotypes.
Acid-etched, solar control low-e glass to provide views, bird-safety, energy performance.
Glass meets aesthetic, energy performance demands for LEED-certified Chicago tower.