Others also read
Diversify, innovate and compete... with Forel Machinery
Vitro will invest $120 million in a float glass furnace at its Garcia manufacturing facility, near Monterrey, Mexico.
Today, 21 June, Glass for Europe answered to the public consultation on revising the Energy Performance of Building Directive (EPBD).
The second day of the LiSEC Campus begins and today another innovation is revealed - this time in the field of insulating glass production! Register now.
Thermoseal Group will again sponsor the Glass and Glazing Industry’s G-Awards Champagne Reception, hosted at the prestigious London Hilton on Park Lane Hotel.
Marked for a whole glass life: Panes and insulating units are given their own identity with the glass-friendly laser marking of HEGLA boraident.
The combiFIN is the fastest and most uncomplicated type of vertical processing of medium-sized glass formats with optimum cycle times and cost-effectiveness.
Thanks to laser technology, the glass industry can do something that would be almost inconceivable in any other sector.
With the GIS 640 R from Optris, temperature differences during glass hardening processes can be quickly detected, thus avoiding rejects.
Isophon Glas ordered two Sparklike Laser Integrated™ insulating gas measurement stations.
Tvitec manufactured more that 4,500 metres of high-performance glass for the new Campus Futura Airbus in Getafe (Madrid-Spain).
Glaston Corporation and Softsolution are collaborating to create even more outstanding quality inspection solutions for tempering lines.
Glas Trösch expands its technical glass division
All tempering, laminating and insulating glass lines from Glaston
Ultra-Clear, Low-E Glass Inside an Artistic Mosaic Frame Creates a Hip Mixed-Use Space
The new, recently installed LineScanner provides Avanti with an automatic, reliable way of inspecting glass without the need of an operator.
Automatic cutting table for monolithic glass RUBI 303VA
Sparklike interviewed Sebastian Plettenberg, Team Manager at Technoform, to find out more about Technoform’s quality assurance and sustainability aspects.
Thompson I.G. is proud to announce that the company has earned Quality Management System - ISO 9001:2015 certification.
Competent. Innovative. Reliable: And very important: close to the customer.
The JaBee Tower, which has been erected in the town of Dübendorf (Switzerland), is currently the highest residential building in Switzerland. It was designed by the Swiss company sattlerpartner architekten+planer.