Others also read
Megatrends shape the supporting program
Energy performance is becoming an ever more important and integral part of architectural design.
New Jumbo Series tempering line furnace at Emirates Glass can process glass up to eight meters tall.
Case study develops prediction tool to derive sound insulation values of arbitrary glass assemblies
Kuraray aligns glass interlayers business to be significantly more innovative
Sometimes a project comes along that clearly demonstrates the diverse benefits of Guardian’s range of high-performance glass – in this case answering the contrasting needs of a hotel’s ground and first floor.
With SILVERSTAR CONTROL, the incoming sunlight can be individually controlled by remote control using a blind integrated into the gap between the panes.
In flat glass processing, glass tempering and heat strengthening are among the steps that consume the most energy, time, and costs.
Şişecam’s flat glass products were preferred in the Folkart Ardıç Residence project in Çeşme/İzmir.
In this first 2022 issue of SKINS, we pause to look back on 2021 through our most-read stories of the year, which we’ve recycled here in case you missed them (more original content coming in 2022!).
Dow to introduce the world’s first commercially available program for carbon-neutral silicones in building façades.
Due to the continuing strong growth in orders, the need to strengthen our team is also increasing.
Hornos Pujol has designed the new EVA LAM-PRO "Jumbo" laminating oven size 69x35.
A new 290-bed public hospital recently open its doors in Solothurn, Switzerland
ARCON-DUR SICHERHEITSGLASS GmbH & Co. KG of Germany is pleased to announce cooperation on digital printing technology to expand their product portfolio.
With cutting and automation solutions from HEGLA, you achieve maximum productivity with perfect edge quality.
To kick off the new year, Glasstech Asia and PERAFI successfully held the 5th webinar of the series titled "Façade beyond Glass and Metal".
FIT Show event director Nickie West responds to the announcement that Fensterbau Frontale has been delayed from March 29 - April 1 until 12 - 15 July 2022.
Glass manufacturer Stoelzle has been producing high-quality packaging glass at seven locations for over 200 years. HORN has now successfully commissioned the new construction of furnace 02 at the Köflach plant in Austria.
In 2021, Windows, Doors & Facades Event (WDF) and Gulf Glass took place alongside The Big 5, bringing the entire construction industry face to face again.
The combiFIN is a nifty combination of different vertical processing devices to create a single intelligent line.
AB-AR and EVALAM VISUAL play a decisive role on the façades of this new business case with 7,300 square meters of laminated glass.
Tvitec’s large-scale solutions light up AstraZeneca’s magnificent Discovery Centre designed by Herzog & de Meuron.