Others also read

A reminder that June 19, 2021 is the last day to reserve your space at VITRUM 2021.
A couple of weeks ago we were in San Antonio, to participate in Glass Texpo 2021. It was a beautiful, interesting, well organized event.
With the GIS 640 R from Optris, temperature differences during glass hardening processes can be quickly detected, thus avoiding rejects.
Glaston Corporation and Softsolution are collaborating to create even more outstanding quality inspection solutions for tempering lines.
AviProtek® and SOLARBAN® Glasses Deliver a Bird-Friendly, Science-on-Display Façade for the University of Saskatchewan’s Collaborative Science Research Building
All tempering, laminating and insulating glass lines from Glaston
NorthGlass Tempering Furnace BU newly signed 74 sets of furnaces with the value of over 140 million in March 2021, which broke the historical record of 68 sets of tempering furnaces in March 2010.
Ultra-Clear, Low-E Glass Inside an Artistic Mosaic Frame Creates a Hip Mixed-Use Space
The project is distinguished by a gleaming, point-fixed structural glass façade— fabricated with Solarban® 70XL glass on Starphire Ultra-Clear® glass by Vitro Glass
HST by Mappi is the ideal partner for the furnaces of the Fox and ATS 4.0 series.
There are personnel changes in the Glaston sales team for the market regions Germany, Austria and Switzerland.
VITRUM programming will be complemented by that for GLASS WEEK, broadcast from the event Hub and on the dedicated digital platform.
4 video episodes streamed on YouTube to discover the Italian Glass Working excellence
The Glaston EASY-LIFTER enables an operator to carry flat glass quickly and easily, having rigid guidance and its own low dead weight.
The order, valued at approximately EUR 9 million, includes in addition to one tempering line, several insulating glass lines, a grinding line as well as other equipment.
Glaston Group has received orders for two Glaston VARIO TPS® insulating glass lines in the United States.
In observance of Earth Day, Vitro is recognizing its growth as an environmentally-focused business.
New ribbon-wrapped Olympic speed skating arena is cool as ice thanks to SentryGlas® ionoplast interlayer from Trosifol
Glaston Corporation will publish its January–March 2021 Interim Report on Thursday, April 29, 2021 at around 13.00 p.m. Finnish time.
Solarban® R77 glass reveals new design possibilities with its neutral-reflective, soft silver-blue aesthetic.
The Pittsburgh Produce Terminal—rehabilitated with Acuity™ low-iron glass and Solarban® 70 glass with an Acuity™ glass interior lite—is a beacon of creativity and innovation in the Steel City.
Glaston Group has signed an over EUR 2 million contract for a Jumbo Series flat tempering line and a ProL flat laminating line with StekloMir LLP.
KellGlass has just installed its first Glaston RC Series furnace last month.
In-depth knowledge of the glass industry, attention to customer needs, constant desire to grow and innovate, these are the characteristics of MaVetro and also the characteristics of Mappi.
The exhibitor registration deadline has been extended for another 60 days: you now have until May 19 to fill out and submit the application form.