Others also read
At the Hotel Riu Palza España, a 7 meter long walkway x 1.8 meter wide made of AB-AR laminated glass has been installed at a height of 117 meters from the ground.
Download DIBt Approval Trosifol® Extra Stiff B230 with Coupling Approach
Flat and curved: customers benefit from sedak's leading glass expertise
Tvitec has a lot of experience employing very advanced techniques in supplying extra-large panes for prestigious international projects.
The new sedak bending furnace produces cylindrically bent glass in oversize formats up to 18 meters.
”Upgrade your living space: modernization with PVC windows”: New European renovation brochure and microsite to be published at the beginning of the year.
Elke Harreiss, Director FENSTERBAU FRONTALE, offers some insights into what the exhibition team is considering as part of its planning for the one-off “Summer Edition” of this world-leading trade show.
Window and door manufacturer BE Bauelemente has been using the A+W iQuote online configurator from A+W Cantor since 2020: Time for a first résumé
Megatrends shape the supporting program
Energy performance is becoming an ever more important and integral part of architectural design.
Case study develops prediction tool to derive sound insulation values of arbitrary glass assemblies
The roofs are smoothly clad with large Alucobond panels and interspersed with OKASOLAR S window areas.
Kuraray aligns glass interlayers business to be significantly more innovative
Sometimes a project comes along that clearly demonstrates the diverse benefits of Guardian’s range of high-performance glass – in this case answering the contrasting needs of a hotel’s ground and first floor.
Advanced low-e glass helps McDonald’s at Disney World generate more energy than it uses
The COLORPRINT FP laminated safety glass with foil print conveys one of EGK’s primary focuses: barrier-free access to complementary medical therapies.
With SILVERSTAR CONTROL, the incoming sunlight can be individually controlled by remote control using a blind integrated into the gap between the panes.
In flat glass processing, glass tempering and heat strengthening are among the steps that consume the most energy, time, and costs.
Şişecam’s flat glass products were preferred in the Folkart Ardıç Residence project in Çeşme/İzmir.
In this first 2022 issue of SKINS, we pause to look back on 2021 through our most-read stories of the year, which we’ve recycled here in case you missed them (more original content coming in 2022!).
Dow to introduce the world’s first commercially available program for carbon-neutral silicones in building façades.
Due to the continuing strong growth in orders, the need to strengthen our team is also increasing.