Others also read
The order, valued at approximately EUR 9 million, includes in addition to one tempering line, several insulating glass lines, a grinding line as well as other equipment.
22nd International Exhibition for Glass Products, Manufacturing, Processing and Finishing Technology
The JaBee Tower, which has been erected in the town of Dübendorf (Switzerland), is currently the highest residential building in Switzerland. It was designed by the Swiss company sattlerpartner architekten+planer.
Glaston Group has received orders for two Glaston VARIO TPS® insulating glass lines in the United States.
“I started working with glass because…I liked it. And this is where I am today”
New ribbon-wrapped Olympic speed skating arena is cool as ice thanks to SentryGlas® ionoplast interlayer from Trosifol
The long-awaited exhibition Mir Stekla-2021 took place in Moscow from 22th to 25th of March, with the attending of many glass processing companies from all over the world.
Forel "High Tech" IG Line is the result of over 45 years of know-how in IG processing machinery.
For six decades, the company has provided innovative individual and complete solutions in flat glass processing and finishing.
The Pittsburgh Produce Terminal—rehabilitated with Acuity™ low-iron glass and Solarban® 70 glass with an Acuity™ glass interior lite—is a beacon of creativity and innovation in the Steel City.
Glaston Group has signed an over EUR 2 million contract for a Jumbo Series flat tempering line and a ProL flat laminating line with StekloMir LLP.
The ECO Scanner from Viprotron is a proven, cost effective system designed to detect glass related defects.
KellGlass has just installed its first Glaston RC Series furnace last month.
In-depth knowledge of the glass industry, attention to customer needs, constant desire to grow and innovate, these are the characteristics of MaVetro and also the characteristics of Mappi.
The show confirms its high demand and marks the return of the Russian glass industry to an active recovery from the constraints of the global pandemic.
The Panel on Safe Glazing was held within the event programme of the Mir Stekla 2021 international exhibition.
In the No. 6 factory building of Tri-Variate Movement centrifugal fan of Luoyang NorthGlass, a row of circulating fans for combustion furnace used in firing ternary catalytic purifier are ready to be launched.
The Panel on Recycling and Re-use of Glass Waste has taken place within the event programme of the Mir Stekla 2021 exhibition.
NorthGlass won the “first choice brand for building glass” award with its strong product research and development and manufacturing capabilities.
The Forum on Translucent Structures. Windows, Facades, Doors, which opens today, is a central event of the event programme of the Mir Stekla 2021.
W-Glass relies on the complete provider competence of LiSEC.
The Panel on the Modern Glass Materials as a Tool to Adapt to Climate Change and Improve Energy Efficiency of the Russian Economy place on the first day of the Mir Stekla 2021 international exhibition.
Sparklike recommends users to calibrate their product once a year.