MOST VIEWED NEWS IN PAST 7 DAYS
8283 results
| Developed by Şişecam Group, revolutionary V-Block Technology which prevents the growth of microorganisms on glass surfaces, is ready to go in to markets as the world’s first antimicrobial glassware.
| The cooperation between Glass Systems and LiSEC started when the new production facility in Swansea was opened.
| Saint-Gobain has begun building its 7th float glass line and 5th mineral wool insulation line in Oragadam, Chennai.
| CO2 emissions well below the industry average
| Inside and out, interlayers from Trosifol prove their capabilities in structural and aesthetic applications... both sides of the Atlantic.
| Glass Performance Days (Tampere): sedak presents isopure and clear-edge.
| Coating independent temperature monitoring and quality control in glass tempering furnaces
| FeneTech, a Cyncly company, presents its software at Glasstec, stand A32, hall 14.
| In the heart of Madrid’s financial centre, in the AZCA district, stands Castellana 77, a building which, after two decades out of service, has begun a new iconic life thanks to luis vidal + arquitectos.
| Neutral-reflective glass features subtle silver-blue aesthetic, code-friendly solar control
| See how the AG-1J36 top and bottom convection glass tempering machine helps optimize your production line.
| glaCE can be used to calculate the radiation values of various insulating glass constructions.
| Katerra, Inc., a technology company redefining the construction industry, has selected Deceuninck North America as its window and patio door systems supply partner.
| VITRUM 2023 awaits you from 5th to 8th September at Fiera Milano Rho with great news and the passion that has always distinguished the event.
| Saint-Gobain has signed a Power Purchase Agreement (PPA) with the top energy supplier in Spain, Endesa.
| All tempering, laminating and insulating glass lines from Glaston
| The Elbphilharmonie is one of the largest and most acoustically advanced concert halls in the world and an outstanding example of modern architecture.
| The entire upgrade took only 25 days. The completed furnace was shorter in length, reducing the line’s footprint. Plus, the machine consumed much less energy, an added benefit.
| Using Glaston FC and RC tempering lines for outstanding glass quality