Others also read

Working closely with designers at Pilkington and IOCHRE, the team developed a bespoke tension structure to support the wall of glazing, which was installed by structural glazing specialist OJ Taffinder.
Boston Pizza brings new life to a historic Yonge Street building with a unique 1,300-square-foot retractable skylight, created by OpenAire.
Situated within the converted water tower of the former Lancaster Moor Hospital, Glazing Vision’s 3 wall box rooflight was key to unlocking the spectacular views from the apartment.
Solar Innovations® was tasked with keeping the original artistry of the building but also updating the conservatory with materials that will be long lasting.
It’s that time of year again – and as the nights draw in and the mornings grow colder, external condensation on your windows may begin to appear in the early hours if you’ve upgraded your windows using high performing energy-efficient glazing.
After Andrew, and partly also driven by the insurance industry, a new hurricane missile testing regime changed construction practices and building regulations across the United States. It remains to be seen if this year’s hurricanes will have the…
The total of 1.6 thousand m2 laminated and tempered facade glazed units manufactured by PRESS GLASS was used for the renovation.
The updated PYROSWISS Smoke Barrier System (SBS) offers more flexibility in size and is even easier to install in a shorter amount of time.
We’re pleased to announce that we’ve expanded our SealFast range with the addition of a new U-channel gasket, that can be used to enhance wind load resistance in windows when used as part of a glazing system.
With public awareness now high around fire safety, Steve Bond, customer and technical support manager - fire protection at Pilkington United Kingdom Limited, discusses how to specify fire-resistant glazing, as part of Fire Door Safety Week.
The entrance utilizes a Pilkington Planar™ clear monolithic structural glass fin wall system with countersunk 905 series fittings.
This week is Fire Door Safety Week, an initiative to help raise awareness of the crucial role fire doors play in buildings. Fire-protection glass is an important component within a fire door, and we regularly work with organisations to raise…
This major new build project at Bideford Community College in Devon was the first where Hazlemere Commercial purchased powder coated window, door and curtain walling extrusions from Sapa Buildings Systems Ltd that were all exclusively made from 100…
We’ve added to our transport portfolio by supplying a range of systems for five new Crossrail stations.
Hueck has supplied its high-performance windows and doors for a new glass-clad London landmark that boasts excellent green credentials.
As the nights get longer and colder, keeping your home warm - especially in the evenings - can be difficult. Making use of the Pilkington K Glass™ range in your home can help to keep your rooms cosy all year round.
Horizontal and vertical glazing systems, and bioclimatic pergolas to be shown at Gulf Glass.
Saint-Gobain is supplying the glazing for the new tramway that links Strasbourg (France) and Kehl (Germany), on the other side of the Rhine.
Coastal home approaches zero-energy with Kolbe's VistaLuxe® Collection windows & doors.
Installed by glaziers Aztec Windows, the LoE-i89 glass is super clear and haze free other like other likeminded low-e products and looks even better with the black aliminium frames which slot in beautifully with the other materials selected.
The main focal point for the building is a full-height wall of Pilkington Planar™ glazing, which rises more than 25 metres tall and spans nine metres wide.
The JPRA Architects design showcases seamless, suspended glass skylights that are designed to flood the center with natural light.
The company is supporting the aims and objectives of Fire Door Safety Week, which takes place in the last week of this month.
This prestigious project is located London and features an interesting design. Euroview supplied glass to suit the design, heat strengthened to reduces thermal fracture risk.
Construction on the new 7-story, 225,000-square-foot facility began in early 2016 and is set to be complete in 2018.